ISO-8 Cleanroom Tenant Improvement

An ISO Class 8 cleanroom inside an existing Fremont light-industrial building: controlled airflow and filtration on the mechanical side, clean power and code-compliant lighting on the electrical side, and California Title 24 documentation to close it out.

LocationFremont, CA
TypeIndustrial TI (Cleanroom)
DisciplinesE · M
Sheets5
SoftwareAutoCAD
PE StampIn-house (TX / CA)

Sample sheets from this set

Redacted sample sheet E2 0 from the ISO-8 Cleanroom Tenant Improvement set
E2 0 MECHANICAL
Redacted sample sheet E3 0 from the ISO-8 Cleanroom Tenant Improvement set
E3 0 MECHANICAL
Redacted sample sheet E SLD from the ISO-8 Cleanroom Tenant Improvement set
E SLD MECHANICAL
Redacted sample sheet M2 0 from the ISO-8 Cleanroom Tenant Improvement set
M2 0 MECHANICAL
Redacted sample sheet MECHANICAL ELECTRICAL CALIFORNIA M1 0 from the ISO-8 Cleanroom Tenant Improvement set
MECHANICAL ELECTRICAL CALIFORNIA M1 0 MECHANICAL

Mechanical

Rooftop-unit selection and scheduling with a full mechanical roof plan (RTU installation per manufacturer requirements, trapped and vented ¾” condensate routed at 1% slope to approved receptacles). The cleanroom air path — filtration, pressurization, and air-change design for ISO-8 — is documented on the floor-plan and detail sheets, with fan/HEPA layout on the mechanical plan.

Electrical

Single-line diagram with arc-flash and load calculation, panel schedules, and ceiling power plans for the cleanroom and the supporting office/reception areas. Grounding and bonding is detailed down to CADWELD connections, ground clamps, and bonding of dry-type transformers — with a new 100 A sub-panel wired through an existing 200 A N3R disconnect. Feeder sizing (4#3/0 CU + ground in 2″ EMT) is shown explicitly for the inspector.

Energy compliance

The NRCC-LTI-E indoor lighting compliance package accompanies the design — the Title 24 form set reviewers require for TI lighting scope in California.

A coordinated M/E set with the ISO-8 air path, an arc-flash-checked single line, and the NRCC-LTI Title 24 forms California reviewers require for TI lighting scope.

Complete MEP permit set built to get approved.

Every mechanical, electrical, plumbing, and fire sheet your reviewer needs — a fixed quote in 24 business hours, first sets in as few as 5 working days, and city comments answered until your permit is issued.