Case studies
Real permit-ready MEP work across residential, commercial, industrial, and institutional projects. Redacted for confidentiality — no client, firm, or address names — but specific about scope, disciplines, sheet count, load numbers, and software.
SS-101
Auto Dealership Renovation
A full-service auto dealership undergoing a major renovation needed complete MEP design coordinated against existing building…
SS-112
Residential Load Calculation
Not every engagement is a drawing set. This one is the most common ask in residential…
SS-111
Townhouse Fourplex
A four-unit townhouse building at mountain elevation — three distinct unit types (A, B, C plus…
SS-110
Storage Facility Campus — 5 Buildings
A five-building commercial storage campus in climate zone 5B, delivered as a single coordinated 34-sheet MEP…
SS-108
Self-Storage Facility
A multi-story self-storage development for a national operator: enormous floor plates, corridor after corridor of lighting…
SS-107
Restaurant Gas Piping — Plan-Review Rescue
A restaurant's permit was stuck on gas piping. The fix was a tight, two-sheet plumbing package…
SS-106
ISO-8 Cleanroom Tenant Improvement
An ISO Class 8 cleanroom inside an existing Fremont light-industrial building: controlled airflow and filtration on…
SS-105
Detention Facility
Institutional work is a different discipline from commercial TI: an I-3 detention facility has security-driven zoning,…
SS-104
Custom Home with Radiant Heating
A ground-up custom home in the Sonoran high desert where the owners chose radiant floor heating…
SS-103
Coastal Custom Home
A custom home on the Big Sur coastline: a demanding marine environment, a jurisdiction with rigorous…
SS-102
A-2 Change of Occupancy — Golf-Simulator Taproom
Converting an existing tenant space into an A-2 assembly occupancy — a taproom with golf-simulator bays…
SS-109
Single-Family Residence — Full Package
A Florida single-family project carried from design through permit corrections — the complete residential paper trail:…
Complete MEP permit set built to get approved.
Every mechanical, electrical, plumbing, and fire sheet your reviewer needs — a fixed quote in 24 business hours, first sets in as few as 5 working days, and city comments answered until your permit is issued.